Collaboration Between La Laguna Council and Tenerife Cabildo to Upgrade Valle Tabares Road (TF-111)

Joint Efforts to Revitalize Valle Tabares Road in La Laguna

A significant meeting took place on September 26, where officials from La Laguna Council and Tenerife Cabildo convened to discuss the much-anticipated upgrade of Valle Tabares Road, commonly referred to as TF-111. This urban thoroughfare plays a critical role in connecting various districts within the municipality, making its enhancement a priority for local authorities.

Understanding the Project’s Importance

Valle Tabares Road serves as a vital artery for the residents of La Laguna, facilitating movement between neighborhoods, schools, and essential services. The need for improvements has been a long-standing demand from the community, prompting both the La Laguna Town Hall and the Tenerife Cabildo to collaborate on this essential project. The initiative aims not only to improve mobility but also to enhance the overall quality of life for residents by ensuring safer and more accessible road conditions.

During the meeting, several key figures were present, including La Laguna’s Mayor, Luis Yeray Gutiérrez, along with the Councillor for Works, Infrastructure and Accessibility, Ángel Chinea, and the Councillor for Urban Planning, Adolfo Cordobés. From the Tenerife Cabildo, Roads Councillor Dámaso Arteaga was in attendance, accompanied by technical representatives from both administrations. Their collective expertise underscores the importance of this project and the commitment to addressing the community’s needs.

Addressing Community Concerns and Safety Measures

Mayor Gutiérrez emphasized the significance of collaboration between the two administrations to meet the community’s demands for improved road conditions. He pointed out that TF-111 is not just a road; it is a crucial connector that impacts daily traffic flow, particularly in areas with high pedestrian activity, such as residential neighborhoods and schools. The Mayor’s remarks reflect a deep understanding of the local context and the pressing need for infrastructure improvements.

The project aims to encompass a variety of enhancements, including resurfacing the road, creating new pavements, refurbishing public spaces, and implementing additional measures to improve road circulation. A primary focus will be on pedestrian safety, ensuring that all users, including children and the elderly, can navigate the area safely. This comprehensive approach to road improvement demonstrates a commitment to fostering a safer environment for all residents.

Financial Commitment and Project Timeline

Dámaso Arteaga provided valuable insights into the financial framework of the project, revealing that the Tenerife Cabildo plans to commence road improvement works on TF-111 in 2026. The total budget allocated for this initiative exceeds three million euros, highlighting the dedication of both administrations to enhance local infrastructure and address the pressing needs of the community.

To streamline the project, La Laguna Town Hall and the Tenerife Cabildo have agreed to expedite the processing of necessary approvals, ensuring that the project can move forward without unnecessary delays. The implementation will occur in three distinct phases, with the first phase concentrating on the section between Avenida de Los Menceyes and Calle El Junquillo. In this initial area, the Cabildo will conduct resurfacing work, after which the Town Hall will assume ownership of the road.

Simultaneously, work will progress on the other two subsections, where the Tenerife Cabildo will oversee construction efforts while the Town Hall manages the required expropriations. This collaborative approach not only enhances efficiency but also ensures that the project meets the community’s needs effectively.

Key points

  • The Valle Tabares Road (TF-111) is crucial for connecting various districts in La Laguna.
  • A meeting was held on September 26 to discuss the road improvement project.
  • The project aims to enhance safety, accessibility, and mobility for local residents.
  • The total budget for the initiative exceeds three million euros.
  • Work is expected to begin in 2026 and will be executed in three phases.
  • The first phase will focus on the section between Avenida de Los Menceyes and Calle El Junquillo.